ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

45V112 72 Qo Fairbanks Morse SERVICE INSTRUCTION Engine Accessories Operation Solid State Magneto BELOIT, WISCONSIN 53511 After testing of the magneto indicates service is D. Remove the four (4) screws which hold required, or if the magneto is in for overhaul, the end cap to the magneto housing. proceed as follows: E. Carefully lift end cap from housing. Note position of all wires. 1. End Cap and Cover Removal A. Remove the two (2) screws which hold the End Cap cover to the end cap. » B. Remove cover and gasket. Inspect for is X cracks. Note condition of carbon brush. It cs should depress and spring back. y C. Use two screwdrivers to pry distributor Le r rotor gently from shaft. Remove the shaft felt from the end cap. Figure 1 KH YE Figure 4 2. Removal of Electronic Components A. Remove two black ground wires from bearing support screw. B. Loosen two screws on top of housing. C. Rotate magnetic rotor until flux lock is broken. D. Coil, together with speed limiter and transformer in end cap, can now be removed from the magneto. Figure 5 Figure 3 b> 3 Instruction S3-8 May, 1979 $3-8 Page 2 3. Removal of Bearing Support Assembly A. Remove the screws which hold the bear- ing support to magneto housing. B. Carefully remove bearing support from housing. C. Note the bearing inside the bearing sup- port. Visually inspect the bearing for signs of failure. Removal of bearing is not rec- ommended unless bearing failure is defi- nitely suspected. Figure 7 Figure 9 4. Removal of Drive Assembly and Impulse Coupling A. Remove the four bolts holding drive shaft assembly to magneto housing. B. Remove the drive assembly. Note how the impulse coupling lugs fit into the slots of the drive shaft feet. Instruction Figure 10 Figure 11 Using a pin punch, force roll pin through the drive shaft. The drive shaft can now be removed from the rest of the assembly. Remove the retaining ring from the drive coupling. Remove the four (4) O-rings from the drive shaft housing. +e go, mt Figure 12 Remove retaining nut and washer from impulse coupling. Using a suitable puller, remove the im- pulse coupling. When removing the cou- pling, care must be taken to remove both sections together. & % Figure 14 Figure 13 Qo Fairbanks Morse S3-8 Engine Accessories Operation Page 3 H. To disassemble impulse coupling, use E. Press the drive end bearing assembly out magnetic rotor shaft as a tool to unwind from the outside of the housing. the impulse coupling. It will be necessary F. Clean and inspect all parts. to remove magnetic rotor as in (5C) below before proceeding. Note that the spring 6. Test Procedures for Transformer in End Cap, unwinds one (1) revolution. Use this Speed Limiter and Generator Coil count to rewind the spring when reassem- A. Prior to the check of electronic compo- bly occurs. nents, the unit should be inspected for physical defects such as cracked bakelite, broken or frayed insulation, pinched or broken wires, faulty contacts, and/or loose mounting screws. Any of these defects can negatively affect perform- ance. B. Transformer Secondary Resistance Test 1. Disconnect brown and black pri- mary wires leading from inside of end cap. Note the two wires leading into the end cap. 5. Removal of Magnetic Rotor and Drive End Bearing A. Remove the oil seal. Figure 15 Figure 18 Figure 16 2. Set ohmmeter in X1000 position. 3. Calibrate ohmmeter by connecting Remove magnetic rotor shaft snap ring. red and black test probes and using Press magnetic rotor out of housing. calibration knob to zero ohmmeter. If drive end bearing is to be removed, use 4. Continuity-test transformer in end snap ring tool to remove retaining ring. cap by connecting black test probe to either primary wire (brown or black) and using red probe to con- tact insert in high voltage tower. Transformer resistance should read 1800-2200 ohms. Any transformer which does not meet these specifi- cations is defective. Do not attempt to remove transformer from capsule in end cap. e ‘ 5. Before proceeding to next test, re- attach black primary wire to genera- Figure 17 tor coil. Leave brown wire open for use in speed limiter test. C. Speed Limiter Test Early cutout, late cutout and erratic spark may indicate a defective speed limiter. 90D

File Type: pdf
File Size: 5 MB
Categories: magnetos