ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

CS Talite….MEC ME Cees fear 7 ee INFORMATION ___ (issued 3-16-78) VOLTAGE- 12. ROTATION See Tabulation BRUSHES 4 POLES 4 VENTILATED No FRAME DIAMETER 41/2″ BEARINGS Absorbent bronze bearings used at both ends. LUBRICATION Soak absorbent bronze bearings and felt oiling pad with SAE 20 cil. Allow excess oil to drain out before as- sembling end head ‘on motor. BRUSH REPLACEMENT Replace brushes when they have. worn to-a length of 1/4″ ce or less. ~ a – SPRING TENSION —=«32 to’ 40 ounces with new brushes. Measure with a spring scale hooked under the brush spring at the brush. Pull the scale on a line opposite the line of force exerted by the brush’ spring and take the reading just as the spring leaves the brush. POLE SHOE INSTALLATION. When, replacing. field coils- install the pole 4 shoes sp that “”~ the longer tip is pointing in the same direction as armature rotation. aN END PLAY Adjust to .005″ to .030” with thrust washers on the – commutator end of the armature shaft. Refer to Parts & Equipment List for thrust washer package. SHUNT FIELD DRAW (77°F) 9.9 to 11.6 amperes at 12.0 volts. (Each coil) TEST SPECIFICATIONS (77°F) Terminal Maximum Torque Voltage Amperes RPM Ft. Lbs. – – – No Load Test 10 – 43 3000 Min. 9 —– ot Stall Torque Test 4 300 0 7 File in the > PUMP MOTOR SFCTTON | 1 2AN Cremer ee peas _ &Q prestalite. eT rr ae SERVICE (Issued 3-16-78) INFORMATION Unit Rotation MEG- 7001 CWDE MEG -7002 CCWDE VIEWED FROM COMMUTATOR END INTERNAL WIRING DIAGRAM

File Type: pdf
File Size: 1 MB
Categories: prestolite