ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

IN estate, MEzZ Pump Motor IN FORMATION” ret agg ETS Issued’ “7784 VOLTAGE 12 ROTATION See Tabulation BRUSHES. 4. …. POLES. 4. VENTILATED No ~ BEARINGS ~ LUBRICATION a BRUSH, REPLACEMENT SPRING TENSION POLE SHOE INSTALLATION + END PLAY SHUNT FIELD DRAW TEST CONNECTIONS CWDE Connect F~l to battery positive Connect F-2 to A-1 — to. Parts -& Equipmen package. FRAME DIAMETER 4-1/2″ – Absorbent bronze bearings used on all except MEZ-7101. MEZ-7101 not supplied with drive Soak absorbent bronze bearings and felt-oiling pad with SAE 20 oil. Allow excess 911 to drain: 2. _ Gut beT ones assambiing: end: ead =Onndtor. feild sal aml oo “Replace brushes When ‘they have’y worn “to a ength: of. 1/4″. or. less.- 32 to 40 ounces with new brushes. Measure with a Spring scale on a iine opposite -the line of – force exerted by the brush spring arid take the _ reading just as the spring leaves . ‘the. brush. “When replacing field coils, instal? . the pole | -. shoes so that the longer tip .is pointing in a counterclockwise direction when. viewed from: , comm end head. Adjust to .005 minimum with thrust. washers on. the commutator end of the armature shaft. Refer. oh st. “For thrust washer | (77°F /25°C) 25.5 to 29.2 amperes at 12.0 volt. Reversible only. CCWDE Connect F-1 to battery positive Connect F-2 to A-2 Connect F-3 and A-2 to battery negative Connect F-3 and A-1 to battery negative TEST SPECIFICATIONS No Load Test Stall Torque Test Fifein the (77°F /25°C) Test reversible motors in both directions. Terminal Maximum Toraue Voltage Amperes . RPM Fu. ibs. 10 81 2350 Min. -@ – 4 315 -0- 7 Med Contig. oo. C) -prestoalite. _Pump Motor yj” , SERVICE Page 2 of 2 a», bSSsued 7/84 ee ae AE ET ~- 4hMEOGRMATIC WN Oe ier Unit Rotation Internal Wiring ~ Sencar MEZ~6101 CHDE Figure 1 MEZ~7001 CWE Figure iL MEZ-7002:: – @WDEY “Figure 1 MEZ-7101 Reversible Figure 2 SHUNT {MINDING VIEWED FROM COMMUTATOR ENO Figure lL Figure 2 ee SE Se LS

File Type: pdf
File Size: 1 MB
Categories: prestolite