©, prestolite_“: SERVICE ~ Starting Motors Page 1 of 2 INFORMATION Issued 11/29/79 VOLTAGE 12 ROTATION See Tabulation BRUSHES 8 POLES 4 DIAMETER 5~3/16″ LUBRICATION BRUSH REPLACEMENT SPRING TENSION TRANSMISSION END PLAY SWITCH ACTION TEST At overhaul, soak all bronze bearings in SAE-20 oil. Allow bearings to drain thoroughly before assembly. Lubricate armature shaft at drive end and with approved low temperature grease. Replace brushes when they have worn for a length of 3/8″ or less. 70 to 90 ounces with new brushes measure with a spring scale hooked under the brush springs at the brush. Pull the scale on a line opposite the line of force exerted by the brush spring and take the reading just as the spring leaves the brush. Mag. Clutch. Adjust to .005″ to .030″ with thrust washer at comm end head. See Parts & Equipment List for thrust washer package. Energize solenoid with a 6 volt source between solenoid assembly to give 1/64″-3/16″ clearance between drive sleeve and thrust surface with solenoid sealed and To test switch action, slip | a steel spacer (See illus- 5 tration for dimensions} fae over the armature shaft pinion stop. With this mt Spacer in place, the bottom and the switch contacts should close terminal and motor terminal. Adjust movable core pinion pushed toward commutator end. us rh between the pinion and the ; ated magnetic switch should under normal voltages. TEST SPECIFICATIONS (77°F/25°C) No Load Test Stall Torque Test Terminal Maximum Torque Voltage Amperes RPM Ft, Lbs. 10.0 200 6000 -0- 1.0 690 -0- 6.5 Printed in USA. L-600 SERVICE MANUAL Cc fy oli 2. @, prestolit Starting Motors Page 2 of 2 SERVICE Issued 11/29/79 INFORMATION Unit Rotation Pinion Position* Special Notes MFJ-6101 CWDE 1-17/32″-1-39/64″ Notes 1,2 MFJ-6201,J0,L CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6202 ,J,K CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6301,A.8,0,J0,K CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6302,L CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6303,8,0,d CWDE 1-51/64″-1- 7/8″ Notes 1,2 MF J-6304 CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6305,1,1A CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6306,C,D CWDE 1-51/64″-1- 7/8″ Notes 1,2 MF J-6401 ,K CWDE 1-51/64″-1- 7/8″ Notes 1,2 MFJ-6501,d CCWDE 1-51/64″-1- 7/8″ Notes 1,2 MF J-6601 ,D CWDE 1-51/64″-1- 7/8″ Notes 1,2 Note 1 – The intermediate bearing must be flush with the bearing bore nearest the armature. Note 2 – The pinion housing bearing must be flush with the bearing bore on the inside of the housing. *This dimension is measured from the mounting face of the pinion housing to the outer edge of the pinion when in “at rest” position. STARTING SOLENOID BATTERY BATTERY VIEWED FROM COMMUTATOR END VIEWED FROM COMMUTATOR END Internal Wiring of Internal Wiring of CWDE Type Motors CCWDE Type Motors