ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

* BRUSH REPLACEMENT crtedin US a. a OPER SERVICE ETK-4102 Small Motor Page 1 of 2° TNFORMA TION: 28528″ rstue0″37865 This series type motor is reversible and is designed for outboard motor lift- ing. There are two field coils, one for eacn rotation. VOLTS 12 BEARINGS LUBRICATION ARMATURE? TEST + – SWITCH SHAFT END PLAY . . COMMUTATOR SPRING TENSION CIRCUIT BREAKER TEST CONNECTIONS TEST SPECIFICATIONS Load test File in the L-600 SERVICE MANUAL ROTATION Reversible POLES 2 BRUSHES 2 Absorbent bronze. At overhaul, add 10 drops of medium engine oil to felts at armature shaft bearings. At assembly, apply a light coat of rust preventative oi] to armature shaft at drive end only. =fue= tor Titernal connectPons: and–iow-res ts tancere f-thewseee -windings, the armature cannot be checked on a growler as’all coils will check shorted. These armatures can be tested by using an A.C. “milliammeter: (5 amperes – ~:~ with 100 scale divisions) and ¢ making a test between bars. Mounted separately. Adjust.to .010″ to -.040″. Refer to Parts & Equipment List for thrust washer package. i . Minimum diameter .936″. Replace armature when commutator has worn.to this dimension. 9. 5 ‘to ll. 0 ounces when compressed to 1/4″ in length. The brushes must be replaced when they have worn down to a length of 1/4″ or less. This unit has a thermal circuit breaker built in the commutator end head which protects the motor in the event of overloads. Contacts open in 4 to 12 seconds when passing 100 amperes of current at 77°F. Contacts close at 12 seconds maximum after initial opening. For CWDE rotation, connect green lead to battery. For CCWDE rotation, connect blue lead to battery. (77°F) Test in both directions of rotation. Terminal Maximum Min. Torque Voltage Amperes RPM Ft. Lbs. 10.95 74 1640 1.00 —_ | w LL MOTOR SECTION 7 ETK . sna Notors WX prestalite. wa Page 2 of 20 SERVICE Issued 3/86.” INFORMATION ETK-4102 NOTE: When reassembling motor, pull out on blue and green leads to remove excess slack from interior of motor. Apply a bead of RTV or equivalent sealer around both leads where they emerge from the grommet. GREEN BLUE VIEWED FROM COMMUTATOR END )

File Type: pdf
File Size: 1 MB
Categories: prestolite