PERATION MANUAL OT-O409 -» FIELD COILTESTER |___TECHNICAL ASSISTANCE & SERVICE MANUFACTURED BY: H._D. RESEARCH CORPORATION 141 West J-5 PHONE(805) 942-5166 LANCASTER, Calif. 93534 out side California——— 800-235 -2)53 ——_ SALES ____ INTERNATIONAL PRODUCTS & MANUFACTURING, INC. SUBSIDIARY OF WABASH INC. 200° EAST DANIELS ROAD PHONE (312) 359 – 4710 PALATINE, ILLINOIS. 60067 CHECK LIST Please inspect the tester and accessories immediately after receiving them and report any damages incurred during ship- ment. Your shipment should contain the standard items shown here, plus optional pieces as ordered. (EL LIMIYED 90 DAY WARRANTY 9 Pst i es eee rng | ” | | | | | EXTRA FUSES OPERATION MANUAL OT-0409 ELECTRONIC ENCLOSURE OPERATION MANUAL OPERATION INSTRUCTIONS GENERAL DESCRIPTION The OT-0100 Field Coil Tester was designed to find inner coil shorts, shunt shorts, pull in coil shorts and case grounds. The tester operates by gen- erating a signal in the rota- ting device and picking up the signal in the field coils and reading this signal on the meters. A good coil will‘re- cord high and a coil which has a shorted winding will read low. The rotating device will be moved as many times as there are field coils in a housing. A reading will be taken when the arrow on the rotating device is pointing at the center of a field coil. The machine was given 2-inputs and 2-meters so that high and low outputs can be read simul- taneous. For example: a shunt coild or hold in coil will read high and a regular coil of few heavy turns will read low. The machine works off 110 Volts AC. HOOK-UP For connection to AC power, only UL-approved sockets and receptacles should be used, and all relevant safety codes should be observed. Plug line cord into 110 Volts AC, then connect the 6 pin Jones plug from field coil mounting assembly as des- cribed in operation section. Assembly of Rotating Device – The shaft with the rotating de- vice (which is made of wood) was removed for shipment and to reassemble, it will be necessary ‘to insert the shaft into the Support bearings. Hold the shaft so that the wood is even with the top of the metal plate. This should put the oscillating coil about in the center of the field coil. Then tighten two set screws in each bearing. The device to limit rotation to 3509 is installed at the bottom of the shaft so that it will hit the small bolt coming out of the bottom of the bearing mount. This rotation limiter must be installed so that the cord does not get caught up and break, and so the rotating device can scan all of the field coils. OPE RATION The test leads are installed red to red, yellow to yellow, black to black. On the face of field coil evaluator hook the 6 pin Jones plug from mounting fixture to face of evaluator. There are 2-sets of dowels to support the field housings (% & 5/16). Four dowels of identical size must be used for each application to center the field housing and to prevent breaking the rotating device. Two of the dowels go inside the housing between 2- fields in the opening normally occupied by the assembly bolts, and 2-dowels go outside of the housing. To set up the meters use one good field housing of the type you are going to be testing. The left meter has a 10turn pot to set the left meter and the right metet has a 1l-turn pot. al Re} ACe! LUT Dowel installation: Most/4}” %. diameter fields will fit /Gverp;the 5/16″ dowels with 5/16″ dowels outside. Most 4″ diameter fields j * Li 2004 SS will fit over the dowe hefswathh Ss 4″ dowels outside. OCIAN Sample Tests: GM Starters – GM builds 3-types of fields, each at which will give different characteristics. The high torque with both input leads together in the red lead clamp and the mid point connected to the black leads, each coil will read the same. Chrysler – Has 3-heavy duty wind- ings and 1-fine wire winding, and these will read similar to Ford fields such as the 3-heavy duty coils will read on the left meter and shunt field will read on the right meter. A straight series coil will be tested the same as a series Delco. Ford – With their hold in winding and the opening within this pole shoe will have peculiar readings as follows: E on Red B on Red Hold Coil E on Red WA 5 on Yellow Don Red The winding opposite the opening reads low because of the can- celling effect of the hold coil. First Test – to test a field – Ford type – pull in type (65 on). Attach red lead to input post, attach yellow lead to pull in coil lead which has been lifted from ground and one black lead to mid point of field winding (where brushes attach). (It is best to touch only the handle while doing these tests as hand contact seems to change the readings.) The rotating device will be stopped with the arrow pointing at the center of each coil and a reading taken. The left meter will read the heavy coils and the right meter will read the hold in or shunt coil. A few good fields will need to be read to get an average read- ing for reference. For example: the left meter has a set pot under the meter. This pot will be used to set the meter to point Dor E ona good field, then a bad field will read less than point B (near A) such as: A poor field will fall in this mms 5 A E A good field will fall in this area For pull in coil turn the right pot to set the right meter to read 4 or 5, on a good coil, atl then a bad pull in coil will read 1 and good ones will read 4 or 5. Bad coil will read 3 in this area 2 4 ae A good coil will fall in this area