ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

Printed in U.S.A. restate, Fb C MER pa P SERVICE Se INFORMATION __(Issued 3-16-78) _ VOLTAGE 12 ROTATION CWDE BRUSHES 4 POLES 4 VENTILATED No FRAME DIAMETER 4 1/2″ BEARINGS Absorbent bronze bearings used at both ends. LUBRICATION Soak absorbent bronze bearings and felt oiling pad with SAE 20 oi11,. Allow excess oil to drain out before as- sembling end head on motor. BRUSH REPLACEMENT Replace brushes when they have worn to a length of 1/4” or less. SPRING TENSION 32 to 40 ounces with new brushes. Measure with a spring scale hooked under the brush spring at the brush. Pull the scale on a line opposite the line of force exerted by the brush spring and take the reading just as the spring leaves the brush. POLE SHOE INSTALLATION When replacing field coils, install the pole shoes so that the longer tip is pointing in the same direction as armature rotation. END PLAY Adjust to .005 minimum with thrust washers on the com- mutator end of the armature shaft. Refer to Parts §& Equipment List for thrust washer package. TEST SPECIFICATIONS (77°F) Terminal Maximum Torque Voltage eres RPM Ft. Lbs. No Load Test 10 55 9500 Min. ——– Stall Torque Test 4 370 0 5.3 File in the R MFB WX Prestolite. TS SERVICE Page 2 of 2 INFORMATION (Issued 3-16-78) Unit MFB-6001 VIEWED FROM COMMUTATOR END INTERNAL WIRING DIAGRAM

File Type: pdf
File Size: 937 KB
Categories: prestolite