ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

Printed in U.S.A. iN VOLTAGE 12 or 24 VENTILATED BEARINGS LUBRICATION BRUSH REPLACEMENT SPRING TENSION END PLAY restolte SERVICE INFORMATION ROTATION See Tabulation MFO Pump Motors Page 1 of 2 Issued 12-1-74 Reversible BRUSHES 8 POLES 4 FRAME DIAMETER 5″ Ball bearings used at both ends. Both ball bearings are prelubricated and sealed. No lubrication required. Replace brushes when they have worn to a length of 3/8″ or less. 52 to 65 ounces with new brushes. Measure with a spring scale hooked under the brush spring at the brush. Pull the scale on a line opposite the line of force exerted by the brush spring and take the reading just as the spring leaves the brush. No adjustment necessary. TEST CONNECTIONS CWDE Rotation Connect S-1 to Battery Positive Connect S-2 to A-1 Connect A-2 to Battery Negative TEST SPECIFICATIONS CCWDE Rotation Connect S-1 to Battery Positive Connect S-2 to A-2 Connect A-] to Battery Negative (77°F) Test in Both directions of rotation. Terminal Max Umum Torque Voltage Amperes Ft. Lbs. No Load Test 12 30 6500 Min. = —– Stall Torque Test 4 400 18 Unit Ventilated MFO-4001 Yes MFO- 4002 No File in the L-600 SERVICE MANUAL => PUMP MOTOR SECTION MFO = “ee ©, prestolite. Pump Motors Page 2 of 2 SERVICE Issued 12-1-74 INFORMATION VIEWED FROM COMMUTATOA END INTERNAL WIRING DIAGRAM

File Type: pdf
File Size: 926 KB
Categories: prestolite