ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

ne SERVICE “keg oo —— INFORMATION ———___{tssued 3-16-78) __ VOLTAGE 24 ROTATION CWDE = — BRUSHES «= 4 =——s«éPOLESS 4 VENTILATED “No FRAME DIAMETER 4A lf2 BEARINGS _ Absorbent bronze bearings used at both ends. _, LUBRICATION . ‘, Soak absorbent bronie. bearings and felt:oiling. pad with..- SAE 20 oi. -.-Allow – “EXCOSS. oil: to drain out™ before ast” on . sembling’, end: head-on motor. a a ra BRUSH REPLACEMENT. Replace brushes when they have worn to a length of 1/4″ : or less, , ; + SPRING TENSION eS ss 32 to 40 ounces ‘with new brushés.. ’ ‘Méasure with a. Spring – ‘scale hooked under the brush spring at the brush. Pull — the scale on.a line opposite the line of force exerted . ‘by the brush ‘spring’ and’ take the © reading Just as. the -. spring leaves ‘the brush,. POLE SHOE INSTALLATION ‘When replacing field coils, install. the, pole. shoes: SO. CN ~ that the longer tip is pointing in the same direction as armature rotation. , END PLAY Adjust to .005” minimum with thrust washers on the com- mutator end of the armature shaft. Refer to Parts §& Equipment List for thrust washer package. FIELD COIL DRAW Each coil 4.0 to 4.8 amperes at 24.0 volt. Both coils 8.1 to 9.6 amperes at 24.0 volt. TEST SPECIFICATIONS (77°F } Terminal Maximum Torque _ Voltage RM Ft. bbs… ° No Load Test > 20 BB 2600 Min. — —– Stall Torque Test 8 105 0 3 File in the a > PUMP MOTOR SECTION MFS Page 2 of 2 (Issued 3-16-78) Unit _ MFS-6001 MFS- 7001 @®& orestolite_ SERVICE INFORMATION INTERNAL WERING: DIAGRAM 0”

File Type: pdf
File Size: 1 MB
Categories: prestolite