ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

Printed in U.S.A, Starting Motors __ SERVICE eget 2 INFORMATION ___Issued 3/16/78. _ ©, prestolite,_sin —___ VOLTAGE 12 ROTATION CCWDE BRUSHES 4 POLES 4 DIAMETER © 4-1/2″. LUBRICATION ; ‘Soak absorbent bronze bearings and felt oiling pad in SAE 20 oil. Allow oil to drain thoroughly before assembly. Lubricate armature shaft with light film of grease before installing drive assembly. BRUSH REPLACEMENT Replace brushes when they have worn to a length of 1/4″ or less. SPRING. TENSION 32 to 40 ounces with new brushes. Measure with a spring | _ scale hooked.under the brush’spring at the brush. Pull | the scale on a line opposite the line of force exerted by the brush spring and take the reading Just as the spring leaves the brush. . ‘ END PLAY Adjust to 060″ with thrust washers at commutator end. See Parts & Equipment List. for thrust washer package: POLE. SHOE INSTALLATION If field coils are » replaced, install. pole. shoes so that the long tip is pointing in the same.direction as armature rotation. TEST SPECIFICATIONS (770F/25°C) – Terminal oS Maximum . Torque Voltage Amperes RPM Ft. Lbs. No Load Test 10.0 47 6,000 – 0 – Stall Torque Test 4.0 325 -~0- 9.0 Unit *Pinion Position Special Notes MHN~4101UT 4-59/64″ – 5-3/32″ Notes l, 2 * Measure from face of mounting flange to outside edge of pinion in “at rest” position. File in the STARTING MOTOR SECTION L-600 SERVICE MANUAL => | | MHN Startin Motors Qy prestolite. SERVICE Page 2 of 2 Issued 3/16/78 NOTE 1 – NOTE 2 – INFORMATION After inspection of various parts, paint terminal stud and brush holder insulation with red glyptol. Cover glypton and all metal surfaces with an air-drying, fungus-resistant insulating varnish. Allow varnish to soak into field coils and: armature windings. Drain and dry thoroughly before assembling the motor. Bearing in drive end must be flush with armature side of bearing bore. INSULATED vA BRUSH INSUL ATE oe BRUSH GROUNCED BPUSH VIEWED FROM COMMUTATOR END prestolite,_ Man __— SERVICE Fase Lobb INFORMATION Issued 3/16/78 VOLTAGE 12 ROTATION CCWDE BRUSHES 4 POLES 4 VENTILATED No FRAME DIAMETER 4-1/2″ BEARINGS Absorbent bronze bearing used at commutator end. Sealed ball bearing used at drive end. LUBRICATION Soak absorbent bronze bearing and felt oiling pad with SAE 20 ofl. Allow excess oil to drain i out before assembling end head on motor. Ball bearing is prelubricated and sealed. No additional lubrication required. BRUSH REPLACEMENT The brushes must be replaced when they have worn to a length of – See Tabulation. SPRING TENSION 32 to 40 ounces with new brushes. Measure with a spring scale hooked under the brush spring at the brush. Pull the seale on a line opposite the line of foree exerted by the brush spring and take the reading just as the spring leaves the brush. . POLE SHOE INSTALLATION When replacing field eoils, install the pole shoes so that the long edge is pointing in the same direction as the armature rotation. END PLAY Adjust to .005″ minimum with thrust washers at C.E. bearing. On the 4005, maintain a dimension of .427″ to .463″ from the drive end mounting face to the end of the armature shaft. Refer to Parts & Equipment List for thrust washer package. TEST SPECIFICATIONS , (77°F / 25°C) Terminal Maximum Torque Voltage Amperes RPM Ft. Lbs. No Load Test 10 47 6000 -0- Stall Torque Test 4 325 – 0 – 9.0 Fileinthe Prited in US.A. L-600 SERVICE MANUAL ==> | van Motor Section

File Type: pdf
File Size: 2 MB
Categories: prestolite