ERA Office: Monday – Friday 9:00-5:00 CST

275 W. BROWN ST, UNION, MO 63084

636-584-7400

office@electricalrebuilders.org

ERA Tech Helpline: 636-584-TECH (8324)

} INFORMATION Issued 11/29/79 ‘VOLTAGE 12 – ROTATION -CWDE – -— : BRUSHES: 2. Ue POLES | OG DEAMETER = 3-1/16″‘ LUBRICATION os Soak all bronze bearings in SAE 20. Allow co: drain thoroughly before assembly. Lubricate “O”-ring-ac drive end of armature with Lubriplate or equivalent before assembly. Lubricate splines on armature shaft a with SAE 20 before installing Bendix unit. BRUSH REPLACEMENT Replace brushes when they have worn to a length of , : Ce _ _ ne SPRING TENSTON | mo Spring tension should be 35 to 40 ounces when spring is compressed to 9/32″. END PLAY Adjust to .010″ to .035″ with thrust washers at com mutator end. Se2 Pares & Equipment List for thrust washer package. (~ . + 10.0 “ HGF BY 500 de oe Stall Torque Teste 4.0 300 – 0 – 3.2 Unit *Pinion Position a ; MJIM-4001 1-41/64″ ~ 1-51/64″ MIM 4002 57/64″ – 31/32″ MIMN-4003 57/64″ — 31/32″ * Pinion position made “sat resec” position measured from mounting face co outside edge of pinion. a VIEWED FROM COMMUTATOR EN File in the Starting “or B ; a -1O s L-600 SERVICE MANUAL ESEED> or Section Pusted in US A,

File Type: pdf
File Size: 698 KB
Categories: prestolite