Printed In U.S.A. KX Prestolite, “oo nite a INFORMATION __Tsaved 11/29/79 VOLTAGE 24 ROTATION DIAMETER 5-3/16″ LUBRICATION BRUSH REPLACEMENT SPRING TENSION TRANSMISSION END PLAY SHIFTING SOLENOID ADJUSTMENT SWITH ACTION TEST See Tabulation BRUSHES See Tabulation POLES 4 At overhaul, soak all bearings in SAE 20 oil before assembling. Apply a film of light grease to the armature shaft and splines before installing the drive assembly. Apply a film of light grease on the “0” ring seals to prevent damaging them during assembly. Replace brushes when they have worn to a length of 3/8″ or less. See tabulation for tension with new brushes. Measure with a spring scale hooked under the brush spring at the brush. Pull the scale on a line opposite the line of force exerted by the brush spring and take the reading just as the spring leaves the brush. Mag. clutch. Adjust to .005″ to .030″ with thrust washers on the commutator end of the armature shaft. Refer to Parts & Equipment List for thrust washer package. With the solenoid energized and the plunger sealed, a clearance of .020″ to .050″ should be maintained between the outside edge of the pinion drive sleeve and the thrust washer with the pinion pushed toward the commutator end. Adjust by removing the plug in the end of the shifting linkage cover and turning the adjusting nut in or out as required. To test switch action, place a steel spacer (See illustration for dimensions over the armature shaft | t/2 between the pinion and the I Fy te /2m thrust washer. Switch © TT contacts should close at 3/4 16.0 volts maximum. TEST SPECIFICATIONS (77°F/25°) No Load Test Stall Torque Test File in the L-600 SERVICE MANUAL Terminal Maximum Torque Voltage Amperes RPM Ft. Lbs. 20.0 65 5000 ~0- 4.0 400 -0- 22.0 SSMPYS6000 em restolte. SP Starting Motors | Page 2 of 3 SERVICE _ rage ove _Taaued 11/29/79 INFORMATION a SPECIAL NOTE: If the mounting flange is removed from the intermediate housing, the housing and flange should be marked so that it is reassembled in its original position. Torque flange retaining boits to 8 Ft. Lbs. SOLENOID SPECIFICATIONS (70°F.) Shunt winding current draw – 4.1 to 4.8 amperes at 12.0 volts. Series winding current draw – 23.2 to 26.6 amperes at 12.0 volts. Shunt winding connected from switch terminal to ground terminal. Series winding connected from switch terminal to motor terminal. Spring Pinion Special Unit Rot. Brushes Tension Position* Notes MFY-6101,AUT,BUT,IUT,KUT CWDE 8 42 to 53 oz. 1-51/64″-1-7/8″ Notes 1,2,3 MFY-6104 ,CUT, KUT ,DUT CWDE 8 42 to 53 oz. 1-51/64″-1-7/8″ Notes 1,2,3 MFY-6201,A,1,K, CWDE 4 80 to 90 oz. 1-51/64″-1-7/8″ Notes 1,2 MFY-6301 CWDE 8 42 to 53 oz. 2-33/64″-2-19/32″ Notes 1,2 MFY-6401,A,1,K,L CWDE 4 80 to 90 oz. 1-51/64″-1-7/8″ Notes 1,2 MFY-6402 CCWDE 4 80 to 90 oz. 1-51/64″-1-7/8″ Notes 1,2 MFY-6501,CUT,EUT CWDOE 8 42 to 53 oz. 1-51/64″-1-7/8″ Notes 1,2,3 *This dimension is measured from the face of the mounting flange to the outside edge of the pinion when in the “at rest” position. Note 1 – The intermediate bearing must be flush with the inside bearing bore on the side toward the armature. The oi] seal should be flush with the edge of the casting. Note 2 – The pinion housing bearing must bottom against the flange on the inside of the housing. Note 3 – After inspection of various parts, paint terminal studs and brush holder insulation with red glyptol. Cover glyptol and all metal surfaces except pilots, head seats, threads, commutator, and bear- ing surfaces with an air-drying, fungus-resistant insulating var- nish. Allow varnish to soak into field coils and armature wind- ings. Drain and dry thoroughly before assembling the motor. ©, prestolite«-« SERVICE starting votors __Page 3oof 3 0 INFORMATION ___ Issued 11/29/79 VIEWED FROM COMMUTATOR END Internal Wiring of CWDE Type Motors VIEWED FROM COMMUTATOR END Internal Wiring of CCWDE Type Motors File in the – | Printed In U.S.A. L-600 SERVICE MANUAL => STARTING MOTOR SECTION